Integrated Wastewater Management Project
Sector: Road • Location: China
Source: Asian Development Bank (ADB)
Restoring the health of river and lake ecosystems and improving resilience to water-related disasters are increasingly important priorities of the Government. According to the Ministry of Environmental Protection, 28% of the available surface water of the country's seven major rivers and 31% of the water of key lakes and reservoirs are unfit for human consumption. Once polluted to this degree, tra
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Restoring the health of river and lake ecosystems and improving resilience to water-related disasters are increasingly important priorities of the Government. According to the Ministry of Environmental Protection, 28% of the available surface water of the country's seven major rivers and 31% of the water of key lakes and reservoirs are unfit for human consumption. Once polluted to this degree, traditional pollution mitigation measures, such as standalone wastewater treatment facilities, are usually insufficient to recovery a water ecosystem. In response, an increasing number of local governments are adopting a more comprehensive approach, whereby they engage engaging private operators to mitigate pollution and restore the health of river and lake ecosystems through multiple, interlocking subprojects tendered under a single basin-wide concession. The project will support the implementation of integrated wastewater management concessions targeting environmental services for rivers and lakes. The ADB loan will support CWE in designing, constructing, and operating a series of facilities spanning several components, including (i) wastewater treatment plants; (ii) sludge treatment plants; (iii) sewage conveyance and interception pipelines; (iv) other civil works, such as the dredging of rivers and lakes, riverbank reinforcements, odor treatment, and landscaping; and (vi) the development of wetlands. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in China
- Beilungang CoalFired
- Sanofi Lantus SoloSTAR Pen Assembly Plant, Yizhuang, Beijing
- Eisai’s New Oral Solid Dose Production Facility, Suzhou
- National Highway No 314 Extension
- Xihoumen Bridge
- Changbei Tight Gas Project, Shaanxi
- Shuangyu District Rural Roads PPP Project
- Shanxi Province National and Provincial Road Surface Reconstruction Project (Jinzhong)
