Integrated Water Resources Management Project
Active · Cambodia
Source: Asian Development Bank (ADB)
The Integrated Water Resources Management Project will be aligned with the following impact: Cambodia's water resources management made climate-adaptive and sustainable to support social and economic growth and protect ecosystem. The project will have the following outcome: livelihoods in the target river basin groups made climate and disaster resilient through climate-adaptive integrated water re
- Status
- Prospective
- Sector
- Water Supply and Storage, Residential, Raw Materials, Fertilizers, Commercial, Government
- Location
- Cambodia
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Integrated Water Resources Management Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Integrated Water Resources Management Project will be aligned with the following impact: Cambodia's water resources management made climate-adaptive and sustainable to support social and economic growth and protect ecosystem. The project will have the following outcome: livelihoods in the target river basin groups made climate and disaster resilient through climate-adaptive integrated water resources management. The project will focus on the river basin groups covering rivers Moung Russey, Pursat, Sanker, and Svay Don Keo located in Pursat Province and Battambang Province in the southwest of the Tonle Sap Lake. These river basins were assessed as highly vulnerable to limited available water due to climate change impacts. In the target basin groups, expected changes to precipitation and temperature patterns will result in higher temperature and evapotranspiration and more rainless days in dry season, which will increase water demands in various sectors in dry season. Substantial increases in wet season rainfalls are also expected, increasing the risk of both riverine and lowland flash flooding events. The potential for increased peak water levels at the Tonle Sap Lake further exacerbates this risk. |
Original sector | Agriculture, natural resources and rural development |
Budget |
Location
Country | Cambodia |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Raw Materials, Fertilizers, Commercial, Government |
Article published date | 2025-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Cambodia
- Koh Kong Bridge
- Stung Atay River Hydropower Station
- CAMBODIA IRRIGATED AGRICULTURE IMPROVEMENT
- BAKHENG WATER SUPPLY PROJECT
- Stung Tatay River Hydropower Dam, Koh Kong
- Lower Sesan 2 Hydropower Dam Construction
- Cambodia: Integrated Water Resources Management Project
- Integrated Urban Environmental Management in the Tonle Sap Basin Project
