logo

Integrated Wildland Fire Management Plan (IWFMP)

Sector: Commercial • Location: United States of America

Source: Grants.gov

Project
Archived

This funding opportunity is only available for the Colorado Plateau CESU region and Great Plains CESU region. Project Title: Integrated Wildland Fire Management Plan (IWFMP) Support at Pinon Canyon Maneuver Site Responses to this Request for Statements of Interest will be used to identify potential investigators for a project to be funded by Fort Carson, which provides professional and technical s

Project Information FAQ

Project Information

4 Q
The project “Integrated Wildland Fire Management Plan (IWFMP)” is an infrastructure initiative in the Commercial sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This funding opportunity is only available for the Colorado Plateau CESU region and Great Plains CESU region. Project Title: Integrated Wildland Fire Management Plan (IWFMP) Support at Pinon Canyon Maneuver Site Responses to this Request for Statements of Interest will be used to identify potential investigators for a project to be funded by Fort Carson, which provides professional and technical support for its Integrated Natural Resources Management Plan (INRMP) in order to facilitate successful implementation of the 16 USC 670c-1 Sikes Act. Approximately $29,945 is expected to be available to support this project for the base task. Optional Task funding may be available $9,400.00 to the successful Recipient/Awardee. Background: Provide support to the Pinon Canyon Maneuver Site (PCMS), Colorado, IWFMP activities. Brief Description of Anticipated Work: This research focuses on the following objectives: 1. The Cooperator will produce an IWFMP for PCMS that is fully compliant with National Wildfire Coordinating Group (NWCG) and Army Wildland Policy Guidance. This task includes, but is not limited to the following work: a. Review existing wildland fire management related documents and policies. b. Conduct site visits to review wildfire infrastructure and equipment needs, observe current firebreak and fuels management, meet with primary stakeholders, etc. c. Compile a comprehensive history of fire at PCMS through existing records, reports, documents, and subject matter experts (research historic range of variability for shortgrass, mid-grass, Pinon Juniper and ponderosa pine ecosystems foothills communities). d. In coordination with local subject matter experts (SMEs), including but not limited to Foresters, Natural Resources Managers, Firefighters, Range Control and Integrated Training Area Management Personnel, Trainers/Operators, and local partner agencies, develop strategies to effectively address wildfire at the installation. Use these to define goals and objectives of the IWFMP. e. Carry out an assessment of ignition probability on the installation through a review of existing records, provided sufficient spatial data exists. f. Establish a fire danger rating system. As appropriate, create or modify training modifications and/or staffing requirements for each fire danger category. g. Analyze weather data from a representative weather station for trends and weather conditions relevant to wildland fire management. h. Establish pre-fire measures to be taken to include firebreak maintenance, fuels management, training, and other requirements. i. Establish return intervals for putting prescribed fire on the ground within the historic range of variability. j. Establish prioritized rotational units for training areas and firebreaks to be subject to prescribed burning, and the return intervals for these units. k. Establish/integrate with existing wildfire response procedures. l. Establish/integrate with existing post-fire rehabilitation, data collection, and other necessary measures. m. Compile all of the above into a PCMS IWFMP that comprehensively addresses all aspects of wildland fire management, and is consistent and does not conflict with the Fort Carson IWFMP nor the Fort Carson Integrated Natural Resource Management Plan (INRMP). The IWFMP will become an appendix in the INRMP. n. Local Subject Matter Experts (SMEs) contributing to the plan must have the opportunity to review and provide comments; the Cooperator must work with the SMEs to incorporate and address comments; the plan must be approved by Installation Management Command (IMCOM) Wildland Fire POCs prior to being finalized. 2. OPTIONAL (Pending availability of funds) The Cooperator shall analyze the change in risk between the baseline risk assessment, already completed for Fort Carson by IMCOM and the Center for Environmental Management of Military Lands (CEMML), and two future scenarios to be agreed upon by the Cooperator and the Fort Carson POCs. NOTE : At this time we are only requesting that you demonstrate available qualifications and skills for performing similar or same type of work. Preferred qualifications include a minimum of ten years of experience with military wildland fire management planning. You will be evaluated for a request for a proposal based on skills and qualifications demonstrated in your SOI. Period of Performance. The agreement will extend 18 months from date of award. An optional task will extend 18 months from date of award. Send your Statement of Interest to: Sandy Justman Contract Specialist CESWF-CT Email: Sandra.justman@usace.army.mil Office: 817-886-1073 Brian Hesford, Project Manager CENWO-PM Email: brian.d.hesford@usace.army.mil Office: 402-995-2759 Timeline for Review of Statements of Interest: RSOI is required to be posted on www.grants.gov for a minimum of 30 days. Review of Statements of Interest will begin 05/14/2020.  For a complete version of the Request for Statements of Interest please read the attached file.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data