logo
ProjectAwarded

Integration Architecture Deployment Project for Icon Water

Sector: Water Supply and Storage • Location: Australian Capital Territory, Australia

Source: Profit by Pakistan Today

Itanz Technologies Limited has secured a five-year contract worth AU$1.75 million with Icon Water Limited, the largest water utility in the Australian Capital Territory, to implement an Integration Architecture Deployment project. The project involves providing integration architecture services to support the utility's system deployment over a five-year period.

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Power Generation (CCGT)
Location
Australian Capital Territory, Australia
Updated
22 Jul 2026
Source
Profit by Pakistan Today

ConstructChat

Ask ConstructChat about Integration Architecture Deployment Project for Icon Water

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Integration Architecture Deployment Project for Icon Water” is an infrastructure initiative in the Water Supply and Storage sector, located in Australian Capital Territory, Australia. Taiyo aggregates data on it from Profit by Pakistan Today.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Itanz Technologies Limited has secured a five-year contract worth AU$1.75 million with Icon Water Limited, the largest water utility in the Australian Capital Territory, to implement an Integration Architecture Deployment project. The project involves providing integration architecture services to support the utility's system deployment over a five-year period.

Original sector

Water Utility

Budget

Location

Country

Australia

State

Australian Capital Territory

Source

Source

Profit by Pakistan Today

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Power Generation (CCGT)

Article published date

2026-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project