Intelligent Transportation Systems Rehabilitation Phase 2
Sector: Broadband • Location: Santa Clara, California, United States of America
Source: Dodge USA
The Work shall consist of, but is not limited to installing fiber optic branch cables in new and existing conduits, fiber optic termination equipment in traffic signal controller cabinets, traffic signal controller cabinets, and electrical service equipment, and other work as shown in the Contract Documents and as directed by the Engineer.
- Status
- Closed
- Sector
- Broadband, Power Generation (CCGT), Road, Telecommunications, Government, Commercial
- Location
- Santa Clara, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Intelligent Transportation Systems Rehabilitation Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work shall consist of, but is not limited to installing fiber optic branch cables in new and existing conduits, fiber optic termination equipment in traffic signal controller cabinets, traffic signal controller cabinets, and electrical service equipment, and other work as shown in the Contract Documents and as directed by the Engineer. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Clara |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Power Generation (CCGT), Road, Telecommunications, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
