Inter-Garrison Road Reconstructions
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work consists of performing full depth recycling (full depth reclamation) of the existing asphalt pavement and placing hot mix asphalt concrete overlay, including but not limited to drainage work, micro milling, pavement delineation, adjustment of frame and cover to grade, clearing and grubbing, and traffic control.
- Status
- Closed
- Sector
- Commercial, Cement, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Inter-Garrison Road Reconstructions
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of performing full depth recycling (full depth reclamation) of the existing asphalt pavement and placing hot mix asphalt concrete overlay, including but not limited to drainage work, micro milling, pavement delineation, adjustment of frame and cover to grade, clearing and grubbing, and traffic control. |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
