logo
ProjectDistressed

InterAndes

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

InterAndes is a company created to construct a 268-KM transmission line connecting TermoAndes to Paso Sico (along the Argentina-Chile border). TermoAndes was an Argentinean subsidiary of Gener (Chilgener) of Chile, which was 50% owned by the AES Corporation of the US. The total project cost was US$90 million, financed with a loan granted by Deutsche Morgan Grenfell and Banco Bilbao Vizcaya (BBV).

Status
Failure
Sector
Government, Power Generation (CCGT), Manufacturing (Industrial)
Location
Autonomous City of Buenos Aires, Argentina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about InterAndes

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “InterAndes” is an infrastructure initiative in the Government sector, located in Autonomous City of Buenos Aires, Argentina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Distressed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

InterAndes is a company created to construct a 268-KM transmission line connecting TermoAndes to Paso Sico (along the Argentina-Chile border). TermoAndes was an Argentinean subsidiary of Gener (Chilgener) of Chile, which was 50% owned by the AES Corporation of the US. The total project cost was US$90 million, financed with a loan granted by Deutsche Morgan Grenfell and Banco Bilbao Vizcaya (BBV). Construction works undertaken by the construction company Abengoa started in 1997 and were concluded in the first semester of 1999. In 2002, AES Corporation filed legal proceedings with an international arbitration tribunal (International Centre for Settlement of Investment Disputes - ICSID) against the Argentinean government. The proceeding seeks compensation for losses incurred by the company at the time of the devaluation of the Argentinean currency. In addition, Gener was in the process of restructuring the debt of its subsidiaries TermoAndes S.A. (the generation company) and InterAndes S.A.. still distressed as of 2009

Original sector

Energy

Budget

Location

Country

Argentina

State

Autonomous City of Buenos Aires

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Government, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project