InterAndes
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
InterAndes is a company created to construct a 268-KM transmission line connecting TermoAndes to Paso Sico (along the Argentina-Chile border). TermoAndes was an Argentinean subsidiary of Gener (Chilgener) of Chile, which was 50% owned by the AES Corporation of the US. The total project cost was US$90 million, financed with a loan granted by Deutsche Morgan Grenfell and Banco Bilbao Vizcaya (BBV).
- Status
- Failure
- Sector
- Government, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Autonomous City of Buenos Aires, Argentina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about InterAndes
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Distressed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | InterAndes is a company created to construct a 268-KM transmission line connecting TermoAndes to Paso Sico (along the Argentina-Chile border). TermoAndes was an Argentinean subsidiary of Gener (Chilgener) of Chile, which was 50% owned by the AES Corporation of the US. The total project cost was US$90 million, financed with a loan granted by Deutsche Morgan Grenfell and Banco Bilbao Vizcaya (BBV). Construction works undertaken by the construction company Abengoa started in 1997 and were concluded in the first semester of 1999. In 2002, AES Corporation filed legal proceedings with an international arbitration tribunal (International Centre for Settlement of Investment Disputes - ICSID) against the Argentinean government. The proceeding seeks compensation for losses incurred by the company at the time of the devaluation of the Argentinean currency. In addition, Gener was in the process of restructuring the debt of its subsidiaries TermoAndes S.A. (the generation company) and InterAndes S.A.. still distressed as of 2009 |
Original sector | Energy |
Budget |
Location
Country | Argentina |
State | Autonomous City of Buenos Aires |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
