Intercast and Forge Demand Response

Sector: Metal • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The Intercast and Forge Demand Response project is Australia’s largest iron casting foundry located in South Australia. IThe company has installed sophisticated energy systems that allows it to provide dispatchable demand response by powering down furnaces during peak events. The project involves the deployment of 10 MW of demand response reserve to be available for each of the three years of the

Project Information FAQ

Project Information

5 Q
The project “Intercast and Forge Demand Response” is an infrastructure initiative in the Metal sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Intercast and Forge Demand Response project is Australia’s largest iron casting foundry located in South Australia. IThe company has installed sophisticated energy systems that allows it to provide dispatchable demand response by powering down furnaces during peak events. The project involves the deployment of 10 MW of demand response reserve to be available for each of the three years of the trial.Key resultsAs a foundry operator Intercast & Forge is a user of power and not a reseller or retailer. The foundry relies on its ability to curtail power quickly, efficiently and safely. Intercast developed an electricity monitoring system which enables it to reduce the foundry’s electricity consumption and assist with load curtailment quickly and safely. This system turns off furnaces and other key equipment using switches in concert with AEMO curtailment requests. The test results indicate the foundry was able to successfully deliver an average of 11 MW compared to Intercast’s contracted MW capacity of 10 MW – successfully demonstrating its ability to reduce electricity consumption.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data