Interconexion Rincon Santa Maria-Rodriguez North

One of 10,000+ projects Taiyo tracks in Argentina.

Source: World Bank Group

Project
Active

In June 2006, the Argentine federal government signed an 82 year contract for the construction, operation and maintenance of the 500/132kv Interconexion Rincon Santa Maria-Rodriguez North with LIMSA SA. Interconexion Rincon Santa Maria-Rodriguez was designed as a 920km transmission line connecting the Hydroelectric plant Yacyreta to the province of Buenos Aires. The northern section was to run app

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Government, Commercial
Location
Argentina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Interconexion Rincon Santa Maria-Rodriguez North

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Interconexion Rincon Santa Maria-Rodriguez North” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Argentina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In June 2006, the Argentine federal government signed an 82 year contract for the construction, operation and maintenance of the 500/132kv Interconexion Rincon Santa Maria-Rodriguez North with LIMSA SA. Interconexion Rincon Santa Maria-Rodriguez was designed as a 920km transmission line connecting the Hydroelectric plant Yacyreta to the province of Buenos Aires. The northern section was to run approximately 672km from the Hydroelectric plant Yacyreta in Corrientes province to a substation in Colonia Elia. Interconexion Rincon Santa Maria-Rodriguez South was part of a federal plan to increase the capacity of the high voltage (500k) transmission network and integrate energy supply and demand throughout Argentina. The project was granted to LIMSA SA through a public competitive tender. The main bidding criterion was the lowest present value of payments during the period of operation and maintenance. LIMSA SA won the tender by presenting the lowest present value. LIMSA SA was a company owned by Argentine Electroingenieria SA y Gerardo Ferreyra. The cost of the transmission line was estimated by LIMSA SA at approximately US $239.34 million. LIMSA SA provided its own financing and by December 2006, 25% of construction was completed. The line was expected to become operational in January 2008. In the project contract, the federal government agreed to pay to LIMSA SA: (1) a monthly fee during the construction period of 20 months and another monthly fee for the first 15 years of the line operation. Both fees were defined based on LIMSA SA’s winning bid. The divested Transener SA (project number 55), the owner of technical license of all high voltage lines, was responsible for supervising the line construction while LITSA was responsible entered into a separate service contract with LIMSA SA for the operation and maintenance. The southern section was simultaneously awarded (Project #4154). In June 2008, the project became operational according to Transener SA. Investments in facilities were converted from Argentine Pesos to USD using the period average market rate for 2006 posted by the International Monetary Fund.

Original sector

Energy

Budget

Location

Country

Argentina

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Government, Commercial

Article published date

2024-09-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project