Interconnection of the electricity grid systems of Burundi, D.R. Congo, Kenya, Rwanda and Uganda under the Nile Basin Initiative (NBI), coordinated by its Nile Equatorial Lakes Subsidiary Action Program (NELSAP).  The project’s main activities comprise construction of the following 400 and 220kV interconnection lines and their associated substations: (i) 260km Uganda to Kenya (Bujagali-Lessos);(ii

Project Information FAQ

Project Information

4 Q
The project “Interconnection of the Electric Grids of Nile Equatorial Lakes Countries” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Burundi. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Interconnection of the electricity grid systems of Burundi, D.R. Congo, Kenya, Rwanda and Uganda under the Nile Basin Initiative (NBI), coordinated by its Nile Equatorial Lakes Subsidiary Action Program (NELSAP).  The project’s main activities comprise construction of the following 400 and 220kV interconnection lines and their associated substations: (i) 260km Uganda to Kenya (Bujagali-Lessos);(ii) 172km Uganda to Rwanda (Mbarara-Mirama-Shango);(iii) 293km DRC to Rwanda (Buhandahanda-Goma-Gisenyi-Kibuye-Shango);(iv) 78km DRC to Burundi (Kamanyora-Bujumbura);(v) 143km Rwanda to Burundi (Kigoma-Butare-Ngozi-Gitega);(vi) Power System interconnection studies & Regional Operational guidelines; and(vii) Project management and coordination. The consultants commenced in February 2016 and held kick-off meetings, submitted the Inception Reports, conducted three review workshops for each study and gave training sessions in April 2016. The draft Final report was submitted in November 2016 and the reivised draft Final Report was submitted for adoption to the NELSAP Steering Committee on 23rd March 2017 bringing the assignment to a close. The financier's remarks at the Steering Committee Meeting was made by a representative of the EU delegation in Kenya. An Article on the project was prepared for publishing in July/August 2016 in the EU newsletter and various posters highlighting EU participation in the project were prepared for use during the 22-23 March 2017 NELSAP Steering Committee Workshop in Nairobi - Kenya.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data