Interconnection of the Electric Grids of Nile Equatorial Lakes Countries
Sector: Power Generation (CCGT) • Location: Burundi
Source: European Union Africa Infrastructure Trust Fund
Interconnection of the electricity grid systems of Burundi, D.R. Congo, Kenya, Rwanda and Uganda under the Nile Basin Initiative (NBI), coordinated by its Nile Equatorial Lakes Subsidiary Action Program (NELSAP). The project’s main activities comprise construction of the following 400 and 220kV interconnection lines and their associated substations: (i) 260km Uganda to Kenya (Bujagali-Lessos);(ii
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Interconnection of the electricity grid systems of Burundi, D.R. Congo, Kenya, Rwanda and Uganda under the Nile Basin Initiative (NBI), coordinated by its Nile Equatorial Lakes Subsidiary Action Program (NELSAP). The project’s main activities comprise construction of the following 400 and 220kV interconnection lines and their associated substations: (i) 260km Uganda to Kenya (Bujagali-Lessos);(ii) 172km Uganda to Rwanda (Mbarara-Mirama-Shango);(iii) 293km DRC to Rwanda (Buhandahanda-Goma-Gisenyi-Kibuye-Shango);(iv) 78km DRC to Burundi (Kamanyora-Bujumbura);(v) 143km Rwanda to Burundi (Kigoma-Butare-Ngozi-Gitega);(vi) Power System interconnection studies & Regional Operational guidelines; and(vii) Project management and coordination. The consultants commenced in February 2016 and held kick-off meetings, submitted the Inception Reports, conducted three review workshops for each study and gave training sessions in April 2016. The draft Final report was submitted in November 2016 and the reivised draft Final Report was submitted for adoption to the NELSAP Steering Committee on 23rd March 2017 bringing the assignment to a close. The financier's remarks at the Steering Committee Meeting was made by a representative of the EU delegation in Kenya. An Article on the project was prepared for publishing in July/August 2016 in the EU newsletter and various posters highlighting EU participation in the project were prepared for use during the 22-23 March 2017 NELSAP Steering Committee Workshop in Nairobi - Kenya. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
