Interest rate reduction "Assiut Dam"
Sector: Geothermal • Location: Egypt
Source: KFW Bank aus Verantwortung
The project involves replacing the more than 100-year-old Nile dam in Assiut with a new one. The basic function of the Assiut dam is to discharge Nile water into the approximately 350 km long Ibrahimia main canal, which supplies 690,000 hectares of agricultural land with irrigation water. The project serves to maintain this function and in this way secures the income base of at least 5 million Egy
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves replacing the more than 100-year-old Nile dam in Assiut with a new one. The basic function of the Assiut dam is to discharge Nile water into the approximately 350 km long Ibrahimia main canal, which supplies 690,000 hectares of agricultural land with irrigation water. The project serves to maintain this function and in this way secures the income base of at least 5 million Egyptians, who mainly farm this land as low-income small farming families. The new dam will be used to integrate a hydroelectric power plant into the dam body. By generating electricity from the renewable energy source hydropower, the consumption of fossil fuels and environmentally harmful CO2 emissions are avoided compared to generation in an alternative thermal power plant, thus contributing to global environmental protection. The capital investments include the construction of the new dam with hydroelectric power plant, lock and road crossing as well as the repair of some ancillary facilities. The project also includes a package of environmental measures to prevent or reduce negative environmental effects and, where necessary, to compensate those affected. The implementation of this environmental program is supported by an accompanying FC measure. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
