logo

Interest rate reduction "Assiut Dam"

Sector: Geothermal • Location: Egypt

Source: KFW Bank aus Verantwortung

Project
Active

The project involves replacing the more than 100-year-old Nile dam in Assiut with a new one. The basic function of the Assiut dam is to discharge Nile water into the approximately 350 km long Ibrahimia main canal, which supplies 690,000 hectares of agricultural land with irrigation water. The project serves to maintain this function and in this way secures the income base of at least 5 million Egy

Project Information FAQ

Project Information

5 Q
The project “Interest rate reduction "Assiut Dam"” is an infrastructure initiative in the Geothermal sector, located in Egypt. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves replacing the more than 100-year-old Nile dam in Assiut with a new one. The basic function of the Assiut dam is to discharge Nile water into the approximately 350 km long Ibrahimia main canal, which supplies 690,000 hectares of agricultural land with irrigation water. The project serves to maintain this function and in this way secures the income base of at least 5 million Egyptians, who mainly farm this land as low-income small farming families. The new dam will be used to integrate a hydroelectric power plant into the dam body. By generating electricity from the renewable energy source hydropower, the consumption of fossil fuels and environmentally harmful CO2 emissions are avoided compared to generation in an alternative thermal power plant, thus contributing to global environmental protection. The capital investments include the construction of the new dam with hydroelectric power plant, lock and road crossing as well as the repair of some ancillary facilities. The project also includes a package of environmental measures to prevent or reduce negative environmental effects and, where necessary, to compensate those affected. The implementation of this environmental program is supported by an accompanying FC measure.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data