logo

INTERIM POWER

Sector: Power Generation (CCGT) • Location: Chile

Source: World Bank Group

Project
Closed

The proposed project constitutes an interim program designed mainly to provide additional power in areas outside the central region where public supply of electric power is now confined to a few widely separate towns, served by isolated systems mostly without adequate generating capacity. Its main elements are: (A) the addition of a 3.4 MW hydroelectric unit to increase the generating capacity in

Project Information FAQ

Project Information

5 Q
The project “INTERIM POWER” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Chile. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project constitutes an interim program designed mainly to provide additional power in areas outside the central region where public supply of electric power is now confined to a few widely separate towns, served by isolated systems mostly without adequate generating capacity. Its main elements are: (A) the addition of a 3.4 MW hydroelectric unit to increase the generating capacity in Antofagasta, the port serving the northern mineral producing region. (B) The installation of a 5 MW gas turbine to increase the generating capacity in Punta Arenas, where the discovery of oil in recent years has added to the economic prospects of the region. (C) The installation of a submarine cable to connect the power system of the Island of Chiloe with that on the mainland; (D) the first year of a three-year program of transmission and distribution system expansion to meet requirements throughout Chile; (E) the provision of imported equipment and the services of consultants.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data