logo
ProjectClosed

INTERIM POWER

Sector: Power Generation (CCGT) • Location: Chile

Source: World Bank Group

The proposed project constitutes an interim program designed mainly to provide additional power in areas outside the central region where public supply of electric power is now confined to a few widely separate towns, served by isolated systems mostly without adequate generating capacity. Its main elements are: (A) the addition of a 3.4 MW hydroelectric unit to increase the generating capacity in

Status
Closed
Sector
Power Generation (CCGT), Oil and Gas, Wind, Government
Location
Chile
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about INTERIM POWER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTERIM POWER” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Chile. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project constitutes an interim program designed mainly to provide additional power in areas outside the central region where public supply of electric power is now confined to a few widely separate towns, served by isolated systems mostly without adequate generating capacity. Its main elements are: (A) the addition of a 3.4 MW hydroelectric unit to increase the generating capacity in Antofagasta, the port serving the northern mineral producing region. (B) The installation of a 5 MW gas turbine to increase the generating capacity in Punta Arenas, where the discovery of oil in recent years has added to the economic prospects of the region. (C) The installation of a submarine cable to connect the power system of the Island of Chiloe with that on the mainland; (D) the first year of a three-year program of transmission and distribution system expansion to meet requirements throughout Chile; (E) the provision of imported equipment and the services of consultants.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Chile

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Oil and Gas, Wind, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project