INTERIM POWER
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Interim Power Project for Honduras will assist in financing the installation of additional diesel capacity and the rehabilitation and expansion of distribution facilities in the capital city of Tegucigalpa. Power has been in short supply in this area for many years. The project is needed to meet the growing demand for power in the Tegucigalpa metropolitan area in the interim period until Rio L
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- Honduras
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about INTERIM POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Interim Power Project for Honduras will assist in financing the installation of additional diesel capacity and the rehabilitation and expansion of distribution facilities in the capital city of Tegucigalpa. Power has been in short supply in this area for many years. The project is needed to meet the growing demand for power in the Tegucigalpa metropolitan area in the interim period until Rio Lindo power becomes available. Its components are: 1) installation at the La Leona station of two diesel electric generating units of 1,250 kw each; 2) expansion and improvement of transmission and distribution facilities sufficient to cater for a demand of 10,000 kw and designed to cater for a future expansion up to 30,000 kw; and 3) further preliminary engineering and survey work for the Rio Lindo hydroelectric scheme. These improvements will increase the power supply in order to meet demand in Honduras. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Honduras |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
