In October 2008, Interligacao Eletrica Pinheiros S.A. a wholly-owned subsidiary of the brazilian company CTEEP, was awarded in a competitive bidding process the contract to build and operate three transmission lines and five substations located in the state of Sao Paulo. Besides CTEEP, other companies took part in the contest, like Cymi Holding and Cobra Instalaciones y Servicios, Orteng Equipame

Project Information FAQ

Project Information

5 Q
The project “Interligaçao Eletrica Pinheiros” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In October 2008, Interligacao Eletrica Pinheiros S.A. a wholly-owned subsidiary of the brazilian company CTEEP, was awarded in a competitive bidding process the contract to build and operate three transmission lines and five substations located in the state of Sao Paulo. Besides CTEEP, other companies took part in the contest, like Cymi Holding and Cobra Instalaciones y Servicios, Orteng Equipamentos e Sistemas Ltda. and Consorcio TBE Brasil. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. CTEEP won three auctions (E,H,K): one for the transmission line and the other two for the substations. Auction E, for the transmission line, was won by the company with a US$ 3.4 million (BRL 6.4 million) revenue (32% below the ceiling), while auctions H and K were 51% and 27% below the ceiling. The contract was signed in October 2008, and the sponsors created the company Interligaçao Eletrica Pinheiros S.A. (IEPIN) to lead the project during the 30-year contract period. The sponsor committed to invest US$ 119.1 million (BRL 218 million) in the transmission line. The construction works commenced in October 2008, but financial closure was only achieved in December 2010, when the sponsor was granted a US$ 67.9 million (BRL 119.6 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. Operations commenced in October 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data