Interligacao Eletrica do Madeira (IEMA)

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Active

In November 2008, Consorcio Madeira Transmissao, an association of CTEEP (51%) and state-owned FURNAS (24.5%) and CHESF (24.5%), was awarded in a competitive bidding process the contract to build and operate 2375-km of transmission lines and two conversion stations located in the states of Mato Grosso, Rondonia, Goias, Sao Paulo and Minas Gerais. Besides Consorcio Madeira Transmissao, other compa

Status
Prospective
Sector
Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Interligacao Eletrica do Madeira (IEMA)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Interligacao Eletrica do Madeira (IEMA)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In November 2008, Consorcio Madeira Transmissao, an association of CTEEP (51%) and state-owned FURNAS (24.5%) and CHESF (24.5%), was awarded in a competitive bidding process the contract to build and operate 2375-km of transmission lines and two conversion stations located in the states of Mato Grosso, Rondonia, Goias, Sao Paulo and Minas Gerais. Besides Consorcio Madeira Transmissao, other companies took part in the contest, though only one participated in the final stage of the process: TME Trans (which belongs to the Brazilian company Neoenergia). The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Consorcio Madeira Transmissao presented the lowest offer, a value of US$ 96.5 million (BRL 176.6 million), 0.21% below the ceiling set by the regulatory agency. The contract was signed in February 2009, and the sponsors created the company Interligacao Eletrica do Madeira (IEMA) to lead the project during the 30-year contract period. The sponsors committed to invest US$ 1.8 billion (BRL 3.5 billion) in the transmission line. In September 2010, the sponsor was granted a US$ 284.1 million (BRL 500 million) loan from BNDES. In December 2011, BNDES granted an additional US$ 171.6 million (BRL 280 million) loan to the company to finance the infrastructure works. Finally, in October 2012 the project reached financial closure when BNDES approved a US$ 922 million (BRL 1800 million) loan package to the project. The construction works commenced in 2010 and were expected to be concluded by 2012. As of March 2013, construction works were behind schedule and operations were expected to commence by April 2013. Commercial operations commenced in August 2013.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project