Interligacao Eletrica Sul
Sector: Power Generation (CCGT) • Location: Brazil
Source: World Bank Group
In June 2008, CTEEP was awarded in a competitive bidding process the contract to build and operate 150-km of transmission line and two substations located in the states of Parana, Santa Catarina and Rio Grande do Sul. Besides CTEEP, twelve other companies took part in the contest: Spanish company Cobra Instalaciones y Servicios; state-owned Eletrosul; Brazilian Triunfo Participações; Schahin Enge
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In June 2008, CTEEP was awarded in a competitive bidding process the contract to build and operate 150-km of transmission line and two substations located in the states of Parana, Santa Catarina and Rio Grande do Sul. Besides CTEEP, twelve other companies took part in the contest: Spanish company Cobra Instalaciones y Servicios; state-owned Eletrosul; Brazilian Triunfo Participações; Schahin Engenharia; Spanish Cymi Holding; Terna Participacoes; Orteng Equipamentos e Sistemas; state-owned Copel Geracao e Transmissao; TBE Brasil; Alupar; Spanish Abengoa; and Elecnor Transmissao de Energia. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. CTEEP presented the lowest offer, a total value of US$ 3.6 million (BRL 6.6 million), 0.5% the ceiling set by the regulatory agency. The contract was signed in October 2008, and the sponsors created the company Interligacao Eletrica Sul to lead the project during the 30-year contract period. In August 2009, the shareholding structure was modified as follows: CTEEP (50.1%) and the Spanish company Cymi Holding S.A., a subsidiary of ACS Group (49.9%). The sponsor committed to invest US$ 20.1 million (BRL 36.8 million) in the transmission line. The construction works commenced in November 2008, but financial closure was only achieved in December 2010, when the sponsor was granted a US$ 10.28 million (BRL 18.1 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. Construction works were expected to be concluded in 2011. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |