International Parkway Project - Terminal B Bridge Replacement
The owner, status and timeline of this project. A free account opens every field.
Source: KDFW
The International Parkway Project at DFW Airport involves replacing the original flyover bridges to Terminals A, B, and C. The project is divided into three 90-day phases, starting with the demolition and replacement of the flyover bridge into Terminal B. New bridges will feature right-hand exits from International Parkway into the terminals.
- Status
- Under Construction
- Sector
- Airport, Bridge, Road
- Location
- Dallas, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- KDFW
ConstructChat
Ask ConstructChat about International Parkway Project - Terminal B Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The International Parkway Project at DFW Airport involves replacing the original flyover bridges to Terminals A, B, and C. The project is divided into three 90-day phases, starting with the demolition and replacement of the flyover bridge into Terminal B. New bridges will feature right-hand exits from International Parkway into the terminals. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Texas |
City | Dallas |
Source
Source | KDFW |
URL |
More Details
Record type | Project |
Sector | Airport, Bridge, Road |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
