Intersection Improvements
Sector: Power Generation (CCGT) • Location: Hagerstown, Maryland, United States of America
Source: Dodge USA
This project entails the maintenance of traffic, demolition, removal and construction of concrete curb, sidewalk, handicap access ramps, signal poles and footings, light poles and footings, handholes, fencing, pavement markings, storm drain structures, storm drain piping; upgrades the traffic signals including pedestrian signal poles, poles and footings, pedestrian signal heads, handholes, conduit
- Status
- Closed
- Sector
- Power Generation (CCGT), Cement, Car parking, Road, Government, Telecommunications, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial
- Location
- Hagerstown, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Intersection Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project entails the maintenance of traffic, demolition, removal and construction of concrete curb, sidewalk, handicap access ramps, signal poles and footings, light poles and footings, handholes, fencing, pavement markings, storm drain structures, storm drain piping; upgrades the traffic signals including pedestrian signal poles, poles and footings, pedestrian signal heads, handholes, conduit and electrical cables; APS pushbutton system with wiring; pavement markings; topsoil and turf es... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Hagerstown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Cement, Car parking, Road, Government, Telecommunications, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
