logo

Interstate 15 railroad canyon road interchange project

Sector: Automotive

Source: Riverside County Transportation Commission

Project
Completed

The Riverside County Transportation Commission, in partnership with Caltrans and the City of Lake Elsinore, upgraded the Interstate 15 Railroad Canyon Interchange in Lake Elsinore.

The project was built to address the needs of the area’s growing number of residents and recreational visitors. The project also was designed to improve traffic flow for people traveling to and from Canyon Lake. Benefi

Project Information FAQ

Project Information

3 Q
The project “Interstate 15 railroad canyon road interchange project” is an infrastructure initiative in the Automotive sector. Taiyo aggregates data on it from Riverside County Transportation Commission.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Riverside County Transportation Commission, in partnership with Caltrans and the City of Lake Elsinore, upgraded the Interstate 15 Railroad Canyon Interchange in Lake Elsinore. The project was built to address the needs of the area’s growing number of residents and recreational visitors. The project also was designed to improve traffic flow for people traveling to and from Canyon Lake. Benefits and features included: Safety: Built auxiliary lanes on I-15 to help drivers enter and exit the highway and reduce traffic back-ups Capacity: Added two new lanes on Railroad Canyon Road through the interchange and new lanes to the on-ramps and off-ramps with I-15 Traffic Flow: Replaced the northbound diamond off-ramp with hook-style on– and off-ramps that both connect to Grape Street Cleaner Air: Reduced the number of idling vehicles waiting to enter/exit I-15, for improved air quality Access: Constructed sidewalks and bike lanes along Railroad Canyon Road

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data