Interstate 25 Escondida Interchange Phase IA/B Study
One of 10,000+ projects Taiyo tracks in New Mexico.
Source: New Mexico Department of Transportation (NMDOT)
The NMDOT, in cooperation with FHWA, is currently working on a study to evaluate the existing interchange in Escondida (I-25 Exit 152). This study will analyze various alternatives and identify an alternative to improve the existing interchange. Additionally, this study will analyze the possible extension of frontage roads 2039 and 2040 to the Escondida interchange.
- Status
- Prospective
- Sector
- Road, Government
- Location
- New Mexico, United States of America
- Updated
- 19 Nov 2026
- Source
- New Mexico Department of Transportation (NMDOT)
ConstructChat
Ask ConstructChat about Interstate 25 Escondida Interchange Phase IA/B Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | study and design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The NMDOT, in cooperation with FHWA, is currently working on a study to evaluate the existing interchange in Escondida (I-25 Exit 152). This study will analyze various alternatives and identify an alternative to improve the existing interchange. Additionally, this study will analyze the possible extension of frontage roads 2039 and 2040 to the Escondida interchange. |
Location
Country | United States of America (USA) |
State | New Mexico |
Source
Source | New Mexico Department of Transportation (NMDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
