Interstate 64 (I-64) at Denbigh Boulevard Interchange Phase 2 Project
One of 10,000+ projects Taiyo tracks in Virginia.
Source: Virginia Department of Transportation (VDOT)
The Virginia Department of Transportation (VDOT), in cooperation with the Federal Highway Administration (FHWA), is constructing a new diamond interchange at Interstate 64 (I-64) and Denbigh Boulevard in the City of Newport News. This new interchange would serve as an additional access point along I-64 between Fort Eustis Boulevard and Jefferson Avenue. This concept will be constructed in two phas
- Status
- Prospective
- Sector
- Road, Bridge, Manufacturing (Industrial), Government
- Location
- Virginia, United States of America
- Updated
- 19 Nov 2026
- Source
- Virginia Department of Transportation (VDOT)
ConstructChat
Ask ConstructChat about Interstate 64 (I-64) at Denbigh Boulevard Interchange Phase 2 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Virginia Department of Transportation (VDOT), in cooperation with the Federal Highway Administration (FHWA), is constructing a new diamond interchange at Interstate 64 (I-64) and Denbigh Boulevard in the City of Newport News. This new interchange would serve as an additional access point along I-64 between Fort Eustis Boulevard and Jefferson Avenue. This concept will be constructed in two phases. Phase 2 of the project will construct the eastbound I-64 access ramps as well as the widening of the Denbigh Boulevard Bridge over I-64 to accommodate turn lanes. Some of the major components of the I-64 at Denbigh Blvd. Interchange Phase 2 project include: Installation of the I-64 east on- and off-ramps on Denbigh Boulevard with second signalized intersection. Widen the Denbigh Boulevard bridge to reduce traffic congestion and queueing and improve safety. A design public hearing was held on Tuesday, June 25, 2024, from 5 -7 p.m. at the Denbigh Community Center (15198 Warwick Boulevard, Newport News, VA). During the public hearing, VDOT shared information and received feedback on the proposed project plans. The draft Environmental Assessment was available for review. Details are below in the Public Involvement tab. Benefits Implementing a new interchange is projected to provide additional mobility and access options to the established urban areas of northern Newport News. Additionally, the interchange is projected to divert demand away from other facilities (Jefferson Avenue) and alleviate congestion at adjacent interchanges that are projected to operate near capacity, particularly at the Jefferson Avenue Interchange with I-64. |
Original sector | Road |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
Source
Source | Virginia Department of Transportation (VDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Manufacturing (Industrial), Government |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
