Interstate 81 Bridge Work at Exit 156
Sector: Road • Location: Virginia, United States
Source: Virginia Department of Transportation (VDOT)
Bridge work on northbound and southbound I-81 at Exit 156 includes milling and paving the bridge deck in both directions, starting with the northbound side. Nighttime lane closures and slow roll operations are expected. Flagging operations will be used during barrier wall placement on Route 640 (Brughs Mill Road). Temporary traffic barriers and lane narrowing are in place.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Bridge work on northbound and southbound I-81 at Exit 156 includes milling and paving the bridge deck in both directions, starting with the northbound side. Nighttime lane closures and slow roll operations are expected. Flagging operations will be used during barrier wall placement on Route 640 (Brughs Mill Road). Temporary traffic barriers and lane narrowing are in place. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
