Interstate 81 Pavement Repairs and Resurfacing
Sector: Road • Location: Chenango, New York, United States
Source: WNBF News Radio
Pavement repairs and resurfacing on Interstate 81 in both directions between Exit 6 south and north - US 11; Ramp (Chenango) and Exit 7 - US 11 (Chenango), with alternate lane closures between Exits 16 and 21 and overnight lane closures through September 30, 2026, between 7 a.m. and 6 p.m.
- Status
- Under Construction
- Sector
- Road
- Location
- Chenango, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- WNBF News Radio
ConstructChat
Ask ConstructChat about Interstate 81 Pavement Repairs and Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Pavement repairs and resurfacing on Interstate 81 in both directions between Exit 6 south and north - US 11; Ramp (Chenango) and Exit 7 - US 11 (Chenango), with alternate lane closures between Exits 16 and 21 and overnight lane closures through September 30, 2026, between 7 a.m. and 6 p.m. |
Original sector | Built Sector |
Location
Country | United States of America (USA) |
State | New York |
City | Chenango |
Source
Source | WNBF News Radio |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
