logo

Interstate-83 John Harris Memorial (South) Bridge Replacement Project

Sector: Government • Location: Palmyra, Pennsylvania, United States

Source: PennLive

Project
Planned

The project involves replacing the John Harris Memorial (South) Bridge on Interstate 83 over the Susquehanna River between Cumberland and Dauphin counties. The new northbound bridge will be built south of the existing bridge, then traffic will be moved onto it. The current bridge will be demolished and a new southbound bridge will be built on its footprint. The project also includes reconfiguring

Project Information FAQ

Project Information

4 Q
The project “Interstate-83 John Harris Memorial (South) Bridge Replacement Project” is an infrastructure initiative in the Government sector, located in Palmyra, Pennsylvania, United States. Taiyo aggregates data on it from PennLive.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves replacing the John Harris Memorial (South) Bridge on Interstate 83 over the Susquehanna River between Cumberland and Dauphin counties. The new northbound bridge will be built south of the existing bridge, then traffic will be moved onto it. The current bridge will be demolished and a new southbound bridge will be built on its footprint. The project also includes reconfiguring the Lemoyne interchange, replacing the South Third Street bridge in Lemoyne, and reconstructing the viaduct from the Susquehanna River to Cameron Street including the Front Street-Second Street interchange.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data