INTEXT 1 Auburn ST
Open · Massachusetts
Source: City of Boston
Install the following steel components in accordance to R & G stamped drawings SO.1, S1.1, S2.1 and S2.2 dated 3-16-2021 1- One – W10 x 39 holes to line up with HSS 31/2 x 31/2 x ¼ column. 138” long 2- Two – MC7 x 22.7 channels w/ ¾” A325 Bolts @ 16” OC. Staggered. 12’ long 3-Two – 3 1/2 x 3 1/2 x ¼ columns 86 15/16th tall and one additional footing. Includes in price is the installation of req
- Status
- Prospective
- Sector
- Commercial, Steel, Government, Metal
- Location
- Charlestown, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 1 Auburn ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Install the following steel components in accordance to R & G stamped drawings SO.1, S1.1, S2.1 and S2.2 dated 3-16-2021 1- One – W10 x 39 holes to line up with HSS 31/2 x 31/2 x ¼ column. 138” long 2- Two – MC7 x 22.7 channels w/ ¾” A325 Bolts @ 16” OC. Staggered. 12’ long 3-Two – 3 1/2 x 3 1/2 x ¼ columns 86 15/16th tall and one additional footing. Includes in price is the installation of required footing as per S1.1 plan. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Charlestown |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Steel, Government, Metal |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
