INTEXT 126 Barnes AV
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
First floor: Install new Sheetrock over existing on all rooms, replace tile in bathroom, move kitchen door sixteen inches towards right side. Second floor: Install new Sheetrock over existing on all rooms, replace tile in bathroom, move kitchen door sixteen inches towards right side, block existing direct access to attic from first floor and open access to attic from second floor only.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- East Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 126 Barnes AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | First floor: Install new Sheetrock over existing on all rooms, replace tile in bathroom, move kitchen door sixteen inches towards right side. Second floor: Install new Sheetrock over existing on all rooms, replace tile in bathroom, move kitchen door sixteen inches towards right side, block existing direct access to attic from first floor and open access to attic from second floor only. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | East Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
