logo
ProjectOpenBP

INTEXT 128 Brighton AV

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

Install steel seismic clips at each existing roof bar joist and epoxy bolt into existing CMU wall - See stamped structural details. Remove and replace failed CMU infill at all former window openings. Replace EPDM and EIFS on all four exterior walls.

Status
Prospective
Sector
Commercial, Steel, Government, Metal
Location
Allston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTEXT 128 Brighton AV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTEXT 128 Brighton AV” is an infrastructure initiative in the Commercial sector, located in Allston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Install steel seismic clips at each existing roof bar joist and epoxy bolt into existing CMU wall - See stamped structural details. Remove and replace failed CMU infill at all former window openings. Replace EPDM and EIFS on all four exterior walls.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Allston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Commercial, Steel, Government, Metal

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project