INTEXT 137 Columbia RD
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
New Parapet wall • Erect staging to front façade and partial sides. • Wrap staging with protective netting and pedestrian protection over door entrances. • Remove existing capping stones on top of parapet wall and store for re-use. If repairs or new stones are required, it will need to be priced accordingly. The unit price for cornice stone is $4,200 per cornice stone. Two cornice stones are inclu
- Status
- Prospective
- Sector
- Water Supply and Storage, Steel, Consumer Products, Commercial, Government, Residential, Metal
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 137 Columbia RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | New Parapet wall • Erect staging to front façade and partial sides. • Wrap staging with protective netting and pedestrian protection over door entrances. • Remove existing capping stones on top of parapet wall and store for re-use. If repairs or new stones are required, it will need to be priced accordingly. The unit price for cornice stone is $4,200 per cornice stone. Two cornice stones are included in the base price as per drawings 1/A200. Coping stone replacement unit price is $1,850. • Demolition of exiting parapet wall down to existing water table which will remain in place. • Remove existing damaged cornice stones and re-cast cornice stones to match existing. There are two cornice stones included in base price. • Sound test 100% of cornice stones. If repairs are necessary, it will need to be priced accordingly. Unit price for one linear foot for large spall repairs as per drawings 4 &; 5/A201 will cost $1,200 per linear foot. Unit price for small spall repairs will cost $350 under 6-inch repair. • Install stainless steel flashing all joints to be soldered. Expansion joints will be installed as per drawing 6/A100 and 6/A201. • Install snow guards over all pedestrian ways. • Install high temp flashing membrane. • Re-build interior parapet with CMU block with rebar and grout. • Install adjustable wall ties. • Build new brick façade back to original height with functioning weep holes. • Re-set existing capping stones. • New brick veneer match color of capping stone and water table with elastomeric coating to match existing. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Consumer Products, Commercial, Government, Residential, Metal |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
