INTEXT 16 Joan RD
Sector: Manufacturing (Industrial) • Location: Hyde Park, Massachusetts, United States of America
Source: City of Boston
Install 1-Grand Teton wood pellet stove according to manufactures and owner's manual recommendations. Using non-combustible floor and wall protection. Running 3" pipe through the wall for the vent and running 2" pipe through the wall for the fresh air intake. Using all manufacture rec. pipe.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Government
- Location
- Hyde Park, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 16 Joan RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Install 1-Grand Teton wood pellet stove according to manufactures and owner's manual recommendations. Using non-combustible floor and wall protection. Running 3" pipe through the wall for the vent and running 2" pipe through the wall for the fresh air intake. Using all manufacture rec. pipe. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Hyde Park |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
