INTEXT 2-4 Dolans CT
Open · Massachusetts
Source: City of Boston
Remove and replace 2 Lally columns per plan. Remove existing 9x9 basement beam, Install 2 - LVL beams (3) - 1.75x7.25 Install 2x10's 16 OC along with existing Rafter ties. Install 2x8's in attic at 16 OC. Point load all posts per plan. Insulate as needed. Sister any damaged joists with 2x8's.
eplan only?
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Jamaica Plain, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 2-4 Dolans CT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove and replace 2 Lally columns per plan. Remove existing 9x9 basement beam, Install 2 - LVL beams (3) - 1.75x7.25 Install 2x10's 16 OC along with existing Rafter ties. Install 2x8's in attic at 16 OC. Point load all posts per plan. Insulate as needed. Sister any damaged joists with 2x8's. eplan only? |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Jamaica Plain |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
