INTEXT 202 Savin Hill AV
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Remove existing roof and repair existing front porch decking, install new roof and gutters, add new walls for closets and pantry, remove existing plaster, add insulation in exterior walls and install new sheetrock and plaster as required (walls and ceilings), repair existing stair to the attic, install new central air ducts and air handler, add new windows in 2 bathrooms. no extended living space
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 202 Savin Hill AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove existing roof and repair existing front porch decking, install new roof and gutters, add new walls for closets and pantry, remove existing plaster, add insulation in exterior walls and install new sheetrock and plaster as required (walls and ceilings), repair existing stair to the attic, install new central air ducts and air handler, add new windows in 2 bathrooms. no extended living space on this parmit |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
