INTEXT 23 Dry Dock AV
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
This proposed construction is for an interior off-site mock-up requested by KP Washington St., LLC (ownership). This mock-up is work related to the primary new construction project at 659 Washington Street, Boston, MA (Kensington Place). The interior mock-up will take up approx 690 square feet within the 2nd floor unit at 25 Dry Dock Ave. that is currently rented by KP Washington St., LLC (see at
- Status
- Prospective
- Sector
- Road, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 23 Dry Dock AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This proposed construction is for an interior off-site mock-up requested by KP Washington St., LLC (ownership). This mock-up is work related to the primary new construction project at 659 Washington Street, Boston, MA (Kensington Place). The interior mock-up will take up approx 690 square feet within the 2nd floor unit at 25 Dry Dock Ave. that is currently rented by KP Washington St., LLC (see attached floor plan). The mock-up will take approximately 1 month to build. It will stay in place for approximately 6 months, at which point we will disassemble it. This mock-up is being used for visual purposes only per the request of the Architect and Owner. There will be NO plumbing work, and demonstration lighting only. The mock-up will be the entryway and kitchen/living area of a sample unit. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
