INTEXT 245 Beacon ST
Open · Massachusetts
Source: City of Boston
All square head bolts will be replaced with new galvanized structural steel bolts, nuts, and washers. Guardrail connections and bracket supports will be reinforced. Wall connections will be sealed to prevent water infiltration, and a protective paint coating will be applied to all fire escape system
- Status
- Prospective
- Sector
- Water Supply and Storage, Steel, Commercial, Government, Metal
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 245 Beacon ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | All square head bolts will be replaced with new galvanized structural steel bolts, nuts, and washers. Guardrail connections and bracket supports will be reinforced. Wall connections will be sealed to prevent water infiltration, and a protective paint coating will be applied to all fire escape system |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Commercial, Government, Metal |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
