INTEXT 27 Leroy ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Boston ISD is asking that all unpermitted work to be removed in the basement area and brought back to the bare studs, flooring removed and all utility hookups removed. We are submitting stamped architect plans for the renovation for the first, second, third and front and rear porches same footprint.
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 27 Leroy ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Boston ISD is asking that all unpermitted work to be removed in the basement area and brought back to the bare studs, flooring removed and all utility hookups removed. We are submitting stamped architect plans for the renovation for the first, second, third and front and rear porches same footprint. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
