INTEXT 28 Leyland ST
Sector: Commercial • Location: Dorchester, Massachusetts, United States of America
Source: City of Boston
Siding removal and replacement with hardy planks. Rear 3 porch demolition and replacement in same footprint as the original. Exploratory demolition of the interior surfaces. Framing repairs of floor surfaces. Upgrade of electrical service to the building. Install new HVAC system - Forced air - to each floor. Build new handi-cap ramp access to the front porch.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 28 Leyland ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Siding removal and replacement with hardy planks. Rear 3 porch demolition and replacement in same footprint as the original. Exploratory demolition of the interior surfaces. Framing repairs of floor surfaces. Upgrade of electrical service to the building. Install new HVAC system - Forced air - to each floor. Build new handi-cap ramp access to the front porch. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
