INTEXT 29 Alpha RD
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
patch and install new finish floor ,install new replacement windows,patch rotten areas, insulate and replace existing vinyl siding,remove damaged areas of walls and ceilings ,and install new gypsum boards ,taped and plaster finish,repair first floor porch rails, balasters ,flooring board.
- Status
- Prospective
- Sector
- Commercial, Government, Manufacturing (Industrial)
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 29 Alpha RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | patch and install new finish floor ,install new replacement windows,patch rotten areas, insulate and replace existing vinyl siding,remove damaged areas of walls and ceilings ,and install new gypsum boards ,taped and plaster finish,repair first floor porch rails, balasters ,flooring board. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
