logo
ProjectOpenBP

INTEXT 30-36 Batterymarch ST

One of 10,000+ projects Taiyo tracks in Massachusetts.

Source: City of Boston

remove loose brick, clean & replace brick. remove and patch cast stone remove loose coatings, coat the horizontal surface cut and repoint brick arches. Optional-replace wood trimn with Azek. Add copper flashing to cover wood blocking. At corner, cut and caulk vertical joint between face brick and red brick.

Status
Prospective
Sector
Metal, Commercial, Government
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTEXT 30-36 Batterymarch ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTEXT 30-36 Batterymarch ST” is an infrastructure initiative in the Metal sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

remove loose brick, clean & replace brick. remove and patch cast stone remove loose coatings, coat the horizontal surface cut and repoint brick arches. Optional-replace wood trimn with Azek. Add copper flashing to cover wood blocking. At corner, cut and caulk vertical joint between face brick and red brick.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Metal, Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project