INTEXT 309 Chelsea ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Remove and rebuild front brick stair, install 4 limestone treads, fix concrete landing and reinstall iron handrail.
Remove old kitchen cabinets and install new cabinets and new appliances. Replace old outlet with new GFI around. Install Recessed Lights for old work and wiring for dishwasher. Level kitchen floor and install new ceramic tiles. Remove damage carpet from the rest of the apartment a
- Status
- Prospective
- Sector
- Steel, Metal, Cement, Residential, Commercial, Government, Manufacturing (Industrial)
- Location
- East Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 309 Chelsea ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove and rebuild front brick stair, install 4 limestone treads, fix concrete landing and reinstall iron handrail. Remove old kitchen cabinets and install new cabinets and new appliances. Replace old outlet with new GFI around. Install Recessed Lights for old work and wiring for dishwasher. Level kitchen floor and install new ceramic tiles. Remove damage carpet from the rest of the apartment and replace it with hardwood floor. 3TH floor rear window need to be replace with new sliding vinyl window. Bathrooms: Remove wall and floor tiles, pedestal sinks, toilets and bathtubs, level floors and install new floors and wall tiles, showers, vanities and high-efficiency toilets. Rewiring lighting and GFI outlet. Some pluming work may need around shower area. Replace all interior doors with a six panel Masonite doors. Replace all baseboards and casing trims, install crown moldings. All exterior Door will be replace with new Masonite steel door. Install new central heat and air conditioning in the tree units. Repair handrail in front inside stairway. All the work above is going to be performed in all the three units. The three story deck will be taken down completely and redone according to plan specification. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | East Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Cement, Residential, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
