logo
ProjectOpenBP

INTEXT 309 Chelsea ST

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

Remove and rebuild front brick stair, install 4 limestone treads, fix concrete landing and reinstall iron handrail.

Remove old kitchen cabinets and install new cabinets and new appliances. Replace old outlet with new GFI around. Install Recessed Lights for old work and wiring for dishwasher. Level kitchen floor and install new ceramic tiles. Remove damage carpet from the rest of the apartment a

Status
Prospective
Sector
Steel, Metal, Cement, Residential, Commercial, Government, Manufacturing (Industrial)
Location
East Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTEXT 309 Chelsea ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTEXT 309 Chelsea ST” is an infrastructure initiative in the Steel sector, located in East Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Remove and rebuild front brick stair, install 4 limestone treads, fix concrete landing and reinstall iron handrail. Remove old kitchen cabinets and install new cabinets and new appliances. Replace old outlet with new GFI around. Install Recessed Lights for old work and wiring for dishwasher. Level kitchen floor and install new ceramic tiles. Remove damage carpet from the rest of the apartment and replace it with hardwood floor. 3TH floor rear window need to be replace with new sliding vinyl window. Bathrooms: Remove wall and floor tiles, pedestal sinks, toilets and bathtubs, level floors and install new floors and wall tiles, showers, vanities and high-efficiency toilets. Rewiring lighting and GFI outlet. Some pluming work may need around shower area. Replace all interior doors with a six panel Masonite doors. Replace all baseboards and casing trims, install crown moldings. All exterior Door will be replace with new Masonite steel door. Install new central heat and air conditioning in the tree units. Repair handrail in front inside stairway. All the work above is going to be performed in all the three units. The three story deck will be taken down completely and redone according to plan specification.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

East Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Steel, Metal, Cement, Residential, Commercial, Government, Manufacturing (Industrial)

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project