INTEXT 31 Fifth AV
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
remove 61 lf of interior walls on second and thired fi remove 61 lf of interior walls on second and third floors cut and frame section of walls to kithen on second floors open up walls as needed for plumber and electrian rough finish plumb for new 2nd floor bath room and 3nd floor and install fixtures after rouph is completed re frame walls and ceiling install 58 sheet rock on walls ceiling tap an
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Charlestown, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 31 Fifth AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | remove 61 lf of interior walls on second and thired fi remove 61 lf of interior walls on second and third floors cut and frame section of walls to kithen on second floors open up walls as needed for plumber and electrian rough finish plumb for new 2nd floor bath room and 3nd floor and install fixtures after rouph is completed re frame walls and ceiling install 58 sheet rock on walls ceiling tap and paint also install doors and moldings on interior oors |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Charlestown |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
