INTEXT 32 Bigelow ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Remodel 2 bathrooms- demo, frame, insulate, sheet rock, plaster, paint, tile. Remove and replace 4 windows in the garage. Demo and reinstall 1st floor (right side) deck, install new footings, frame 2x8 pressure treated frame in same size as existing deck. Remove railings in front deck and stairway and replace with new composite railings. Replace rotted shingles as needed to match existing.
- Status
- Prospective
- Sector
- Car parking, Commercial, Government, Automotive
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 32 Bigelow ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remodel 2 bathrooms- demo, frame, insulate, sheet rock, plaster, paint, tile. Remove and replace 4 windows in the garage. Demo and reinstall 1st floor (right side) deck, install new footings, frame 2x8 pressure treated frame in same size as existing deck. Remove railings in front deck and stairway and replace with new composite railings. Replace rotted shingles as needed to match existing. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Government, Automotive |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
