INTEXT 39-41 Salutation ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Redo the Existing Decking between the Units 1A &; 1B - Behind the Building. Remove the existing patio over the concrete slab and redo it with composite decking material accordingly to the Plan (drawing) attached. No footing needed - The deck will be framing using Pressure Treated 2x 6 - 16 O.C
- Status
- Prospective
- Sector
- Commercial, Cement, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 39-41 Salutation ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Redo the Existing Decking between the Units 1A &; 1B - Behind the Building. Remove the existing patio over the concrete slab and redo it with composite decking material accordingly to the Plan (drawing) attached. No footing needed - The deck will be framing using Pressure Treated 2x 6 - 16 O.C |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
