INTEXT 429 Dudley ST
Open · Massachusetts
Source: City of Boston
• House Renovation: Inside work o Repair drywall in ceilings and walls in basement 1st ,2nd &; 3rd and Plaster o Paint all walls and ceilings (prime and paint with 2 coats) owner will choose color o Molding, paint (doorframes and window frames) • Electrical - o Remove all electrical wiring o Re wire whole house and put electrical up to code o Install power outlets and switches o Place new electric
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial, Government
- Location
- Roxbury, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 429 Dudley ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | • House Renovation: Inside work o Repair drywall in ceilings and walls in basement 1st ,2nd &; 3rd and Plaster o Paint all walls and ceilings (prime and paint with 2 coats) owner will choose color o Molding, paint (doorframes and window frames) • Electrical - o Remove all electrical wiring o Re wire whole house and put electrical up to code o Install power outlets and switches o Place new electrical panel 200amps, place 2 sub panel o Install light fixtures as needed o Install smoke detectors/ carbon monoxide • Plumbing for 3 Bathrooms and Kitchen o New plumbing throughout the house to bring up to code o Provide and Install plumbing fixtures o Faucet and sink as needed o Place kitchen cabinetry o New kitchen sink o Countertop o Bathrooms sink, vanity, and tubs o Ceramics tiles on floors and walls in bathroom o Bathroom ceiling vents and light o Plumbing for New dishwasher • Flooring o Ceramic tiles on kitchen floor o Repair hardwood floor and refinish. 1st floor o Laminate flooring on 2nd and third floor • Heating o Remove existing boiler, piping and radiators o Place new Gas boiler (3 Zones) o New water heater o Place new baseboard heat o Provide and Install plumbing fixtures as in plumbing schedule Basement: • Set up new laundry room |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roxbury |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
