INTEXT 5 Cygnet ST
Open · Massachusetts
Source: City of Boston
Complete interior/exterior gut renovation of 5 Cygnet St. Brighton, MA with exception of the following: 1st Floor Mudroom Remove all existing fixtures and cabinets. Remove wall and ceiling coverings to Framing. Remove floor coverings to subfloor. Reframe according to Engineer’s Plans. Rewire 1st and 2nd floors. Provide hardwired Smoke/CO detectors throughout house. Plumb new 2nd floor bathroom and
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 5 Cygnet ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Complete interior/exterior gut renovation of 5 Cygnet St. Brighton, MA with exception of the following: 1st Floor Mudroom Remove all existing fixtures and cabinets. Remove wall and ceiling coverings to Framing. Remove floor coverings to subfloor. Reframe according to Engineer’s Plans. Rewire 1st and 2nd floors. Provide hardwired Smoke/CO detectors throughout house. Plumb new 2nd floor bathroom and shower room and new 1st floor kitchen. Insulate to code. Install blueboard/plaster, Trim, Tile, Cabinets. Clients to paint after work is done. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
