INTEXT 520 Beacon ST
Sector: Cement • Location: Boston, Massachusetts, United States of America
Source: City of Boston
Cut and repoint 100% of the mortar joints from the walls inside enclosed Air Shaft on 520 Beacon side. Caulk, prepare and paint all window trims. Repair concrete windowsills and lintels as needed. Remove and replace 2 sections of galvanized downspout. Work to be performed via scaffolding.
- Status
- Prospective
- Sector
- Cement, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 520 Beacon ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Cut and repoint 100% of the mortar joints from the walls inside enclosed Air Shaft on 520 Beacon side. Caulk, prepare and paint all window trims. Repair concrete windowsills and lintels as needed. Remove and replace 2 sections of galvanized downspout. Work to be performed via scaffolding. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
