INTEXT 53 Prince ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Unit 1-remodeling bathroom. installing new drainage &; water piping with 1-elongated water closet, 1- vanity, 1-walk in bathtub. replace bathroom window. insulate, blue board &; plaster, ceramic tile &; paint. install finish fixtures. ceiling light &; fan, gfi. install ramp for wheelchair 1/4 inch per foot (on right side of home).
- Status
- Prospective
- Sector
- Water Supply and Storage, Residential, Commercial, Government, Waste Processing and Treatment
- Location
- Jamaica Plain, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 53 Prince ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Unit 1-remodeling bathroom. installing new drainage &; water piping with 1-elongated water closet, 1- vanity, 1-walk in bathtub. replace bathroom window. insulate, blue board &; plaster, ceramic tile &; paint. install finish fixtures. ceiling light &; fan, gfi. install ramp for wheelchair 1/4 inch per foot (on right side of home). |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Jamaica Plain |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Commercial, Government, Waste Processing and Treatment |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
