INTEXT 58 Mozart ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
paint/patch ceilings and walls, refinish hardwood floors, replace main entry tile floor, replace bathroom floor tile and tub walls, overlay 1/4" thick drywall on bathroom walls, patch paint emergency staircase replace bathroom vanity and toilet, epoxy paint bathroom tub, replace bath light fixture and ceiling fan, repair main exterior entry steps including landing. Apart 1 & 2
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Jamaica Plain, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 58 Mozart ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | paint/patch ceilings and walls, refinish hardwood floors, replace main entry tile floor, replace bathroom floor tile and tub walls, overlay 1/4" thick drywall on bathroom walls, patch paint emergency staircase replace bathroom vanity and toilet, epoxy paint bathroom tub, replace bath light fixture and ceiling fan, repair main exterior entry steps including landing. Apart 1 & 2 |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Jamaica Plain |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
