INTEXT 59 Faraday ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Replacement of windows, create new bath on first floor,install two kitchens (1st &;2nd floor) repair bath on second floor, repaint entire house inside and out, cover exterior sill and fascia with aluminum coil. Repair garage roof, repair cracks and repaint. refer to ALT689463
- Status
- Prospective
- Sector
- Car parking, Steel, Metal, Commercial, Government, Automotive
- Location
- Hyde Park, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 59 Faraday ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replacement of windows, create new bath on first floor,install two kitchens (1st &;2nd floor) repair bath on second floor, repaint entire house inside and out, cover exterior sill and fascia with aluminum coil. Repair garage roof, repair cracks and repaint. refer to ALT689463 |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Hyde Park |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Car parking, Steel, Metal, Commercial, Government, Automotive |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
