INTEXT 6-8 Bentham RD
Sector: Road • Location: Dorchester, Massachusetts, United States of America
Source: City of Boston
Remove 2nd floor flooring and roof replace with new, replace flooring with composite. Remove exiting roof to sheathing and replace with 25 year asphalt shingles. Install GAF or equal, Ice and water shield, drip edge.Work to include all new step flashing at cheeks and dormer.
- Status
- Prospective
- Sector
- Road, Water Supply and Storage, Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 6-8 Bentham RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove 2nd floor flooring and roof replace with new, replace flooring with composite. Remove exiting roof to sheathing and replace with 25 year asphalt shingles. Install GAF or equal, Ice and water shield, drip edge.Work to include all new step flashing at cheeks and dormer. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
