INTEXT 60-62 Mapleton ST
Open · Massachusetts
Source: City of Boston
Repair sill damage. Extend height of rubblestone foundation to elevate sill above grade at the existing stepped location. Replace (2) masonry columns with (2) 4" lally columns. Infill (4) interior cased openings. Replace floor joists where chimney opening previously existed. Rebuild front porch floor system.
- Status
- Prospective
- Sector
- Commercial, Cement, Government
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 60-62 Mapleton ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Repair sill damage. Extend height of rubblestone foundation to elevate sill above grade at the existing stepped location. Replace (2) masonry columns with (2) 4" lally columns. Infill (4) interior cased openings. Replace floor joists where chimney opening previously existed. Rebuild front porch floor system. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
