INTEXT 63 Jacob ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Re- wire kitchen. Install new kitchen cabinets and floor tiles. Install new hand rails 2nd floor. Repair existing rear steps. Patch holes in basement and remove 1 wall in basement. Install ceramic wall tiles in 2nd floor bathroom walls and floor. Install ceramic floor tiles and repair walls 1/2 bath on 1st floor. Paint kitchen.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 63 Jacob ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Re- wire kitchen. Install new kitchen cabinets and floor tiles. Install new hand rails 2nd floor. Repair existing rear steps. Patch holes in basement and remove 1 wall in basement. Install ceramic wall tiles in 2nd floor bathroom walls and floor. Install ceramic floor tiles and repair walls 1/2 bath on 1st floor. Paint kitchen. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
